New 9-Story Concrete Parking Structure with Conditioned Walkway and Bridge Connectors

Client: Veterans Development, LLC (Owner); Donley's Inc. (Design-Build Contractor)

Scope: 2,000 Stalls

Construction Cost: $29,500,000

Completion Date: April 2011

The post-tensioned concrete parking structure is 9 stories and includes conditioned walkway and bridge connectors to the adjacent Domiciliary, the VA Administration Office building (both designed by KAI) and the VA Medical Center across East 105th Street.  KAI developed the design for the Parking Structure, Domiciliary, Office Building and Bridge Connectors with a consistent theme to provide a “campus” type setting within the context of the existing Cleveland VA Medical Center complex.